← Blog

2026-08-27 · Fidele Maniraruta

Customer Changed the Scope After You Quoted? How to Send the Second Quote Without Losing the Job

You walked the job, you wrote the number, you sent it. Then two weeks later they call and say actually, while you're in there, can you do the back wall too. Or they picked a different tile. Or the deck grew by six feet.

So now you need to send a second quote, and it's higher than the first one. And you already know how that reads on their end. They saw one number, they got used to it, and now you're showing up with a bigger one.

This is a different animal than a change order. A change order is mid-job, work already started, and you've got leverage because you're standing in their house. This is before anything's begun, when they can still walk to the next guy. Handle it wrong and you look like the contractor who quoted low to get in the door.

Here's how to do it clean.

🛠️
Free: every follow-up text, written for your trade

Pick your trade and the situation, get 3 copy-paste texts instantly. Drop an email and all 18 unlock, plus the day-by-day send schedule.

Get the texts →

First, make sure it's actually a scope change

Half the time it isn't. It's a memory problem.

Customers forget what was in the quote. They'll swear the paint was included when your quote says prep only. They'll think the demo was covered because you talked about it in the driveway. That's not them adding work, that's them misremembering what they bought.

So before you re-price anything, go pull your original quote and read the line items back. Not defensively, just plainly:

"Let me make sure I've got this right. The quote I sent covered the tear-off and the new membrane, but not the fascia. You're wanting the fascia done too?"

If they say yes, it's a real change and you re-quote. If they go oh, I thought that was in there, now you're having a completely different conversation, and it's an easier one. You're not raising a price, you're clarifying one. Sometimes you eat a small item to keep the peace. That's a judgment call, not a rule.

Do this step every single time. It takes two minutes and it stops you from writing a bigger quote for work that was never actually added.

Kill the first quote out loud before you write the second

This is the part most guys skip, and it's the part that causes the fight later.

If you just send a new number without saying anything, the customer's got two live quotes in their inbox and they're going to hold you to whichever one they like better. Six weeks from now when the invoice shows up, they'll pull out quote one and say but you told me it was this.

So say it directly, in writing:

"Since we're adding the fascia, quote #1 from the 8th doesn't apply anymore. I'm replacing it with a new one. Ignore the old number, this is the one that counts."

One sentence. It costs you nothing and it ends the argument before it starts. Put it at the top of the new quote, not buried in the middle.

Re-price the whole job, not just the add-on

The lazy move is to take your old total and tack on the price of the extra piece. Don't.

When scope changes, other stuff changes with it. More material means a bigger order and sometimes a different supplier run. A bigger footprint might push you from one day to two, which means a second mobilization, another trip, another day you can't be on somebody else's job. Extra work might change the sequence, and now the finish carpenter has to come back twice instead of once.

None of that shows up if you just add a line. Price the job like you're seeing it for the first time. Then compare it to your old number and make sure the difference makes sense to you before you ask a customer to make sense of it.

If the new total is a lot more than the old one plus the obvious add, be ready to explain why. You should be able to. If you can't, you got the first one wrong.

Word it so it reads like math, not like a squeeze

The customer's fear is that you're using their change as an excuse to jack the price. So show your work.

Bad version:

"With the changes the new price is $14,200."

That's a number with no story. It invites them to negotiate it.

Better version:

"Original quote was $11,400 for the 900 square feet. Adding the back section brings it to 1,250 square feet, so material goes up about $1,900 and it becomes a two day job instead of one, which is another $900. New total is $14,200."

Same number. Completely different feeling. Now they're reading arithmetic instead of a demand. If they want to trim, they'll trim scope, which is the conversation you actually want, instead of trying to trim your margin.

You don't have to hand over your full cost breakdown to do this. You just have to connect the increase to the thing that changed.

Put a date on it

Your first quote probably didn't have an expiry, or if it did, nobody looked at it. Put one on the second.

"Good for 30 days. Material pricing has been moving and I can't hold it past that."

Two reasons. One, it's true, and it protects you if lumber or shingles move again while they think about it. Two, an open-ended quote sits in a drawer forever. A quote with a date on it makes them pick a lane.

Don't make it aggressive. Thirty days is normal and nobody argues with it.

Sometimes the right answer is no

Not every scope change is a bigger job. Some of them are a worse job.

They want you to tie new work into something you didn't build and can't warranty. They want to supply their own material. They want you to work around a section they're not ready to touch, which means you're coming back a third time for free. They added the piece that turns a clean two day job into a scattered week.

You're allowed to say no to the addition and keep the original quote alive:

"I can do the original scope at the price I quoted. The addition I'd have to pass on, it ties into work I can't stand behind. Happy to do the first part if you still want it."

That's not losing the job. That's keeping the good part of it and handing the headache to somebody else.

What not to do

Don't send the new number without a word of explanation and hope they don't notice. They notice.

Don't apologize for the increase. If the price went up because the job got bigger, that's not something you did to them. Guys who over-apologize end up discounting to fix a problem that didn't exist.

Don't leave the original quote alive in writing. Replace it, say you're replacing it, and reference the old one by date so there's no ambiguity.

And don't let the second quote sit there unfollowed because you feel weird about the higher number. That's the one that kills most of these.

The real problem: quote two goes quiet more than quote one did

Here's the pattern nobody warns you about. The first quote, you follow up on. You're fresh off the site visit, it's on your mind, you check in.

The second quote you tend to leave alone. The number went up, you feel a little awkward about it, and part of you figures if they want it they'll call. So it sits. Then three weeks pass and the job is gone, and you never actually find out whether it was the price or just that they got busy and forgot.

Most of the time it's the second one. Scope changes come from customers who are still thinking, still deciding, still moving things around in their head. Those people go quiet all the time and it doesn't mean no. It means not yet, and they need a nudge that you're not going to give them because it feels pushy.

QuoteChaser handles that part for you. Log the revised quote and it keeps a steady, polite follow-up going by text and email, spaced out so it never reads as nagging. If they reply, it stops and pings you right away so you can pick it up as a person. If they don't, it keeps the job warm instead of letting it die in silence while you're busy on somebody else's roof.

The jobs you re-quoted are usually the ones you want most. The customer already picked you once, they just changed their mind about what they wanted. Don't lose them to a follow-up you felt too awkward to send.


Keep reading: How to write a change order · Customer keeps asking you to redo the quote? · Responding when a customer says the price is too high

Don't write the next one from scratch.

Get all 18 follow-up texts free →

Want the sending handled for you too? Join the QuoteChaser waitlist.

While you wait — let Claude run your back office. 6 install-ready AI skills for trades: quotes, follow-ups, reviews, invoices, marketing, customer texts.

Get Contractor Office OS — $37 →